Home » Past Questions » Commerce » The cost which is incurred asa result of failure to load or unload a ship at the...

The cost which is incurred asa result of failure to load or unload a ship at the...


Question

The cost which is incurred asa result of failure to load or unload a ship at the ports within a specified period is referred to as

Options

A) demurrage charges

B) premium charges

C) excess charges

D) trade charges

The correct answer is A.


More Past Questions:


Discussion